What’s new
Last updated: November 20, 2026
November 20, 2026
- Opportunities
Opportunity pages show the city, not only the state
The location tag at the top of an opportunity now reads "Chalmette, LA" when the notice names a city. It showed the state alone before.
Open → - Opportunities
See who the buying office has awarded this work to
Federal opportunity pages now list recent awards for the same kind of work from the same buying office, with the firm, end date and amount, taken from USAspending.gov. When the records point to one firm as the likely current contractor, it is marked "Possible incumbent". Award numbers, there and on the Competitors page, now open the award on USAspending.gov. On plans with Competitors, firm names open that firm's award history.
Open →
November 19, 2026
- Platform
Find SDVOSB subcontractors in one click, and certification filters that match their labels
Subcontractor Search has a row of one-click filters above the results for SDVOSB, 8(a), HUBZone and WOSB firms; each keeps the trade and state you already searched. The certification filters were returning the wrong firms and now return what their labels say, and ticking more than one shows firms with any of them. SDVOSB, veteran-owned and SDB status is what a firm reported in SAM, so those are marked self-reported with a link to confirm on SBA's certification search before you team. An 8(a) or other SBA certification that SAM lists as ended shows as a grey "ended" badge with the year.
Open →
November 18, 2026
- Opportunities
Set-asides are read from the documents when SAM.gov leaves them blank
Some federal notices, most often from the VA, are posted on SAM.gov with no set-aside even though the solicitation is set aside for one program, such as SDVOSB. We now read the set-aside from the solicitation documents in those cases. Bids restricted to a certification you do not hold leave My Matches, bids that match your certification score higher, and the set-aside on the opportunity page says on hover when it was read from the documents.
Open → - Opportunities
More agency forecasts now appear in Pipeline Forecast
Forecasts from agencies that leave the acquisition status blank, including much of Interior, Agriculture, GSA, Transportation and Education, were missing from Pipeline Forecast. They now appear in the list and in My Matches there. Awarded records and ones whose work has already started are still hidden.
Open →
November 16, 2026
- Opportunities
Matches now respect your size under each NAICS code
If you mark a NAICS code Not small on your profile, solicitations set aside for small businesses under that code (including SDVOSB, HUBZone, WOSB and 8(a) set-asides) no longer appear in My Matches, and their page says why. Codes you have not answered for, unrestricted bids and partial set-asides are unchanged. A set-aside under a code you have not answered for, in an industry where you marked a related code Not small, stays in your matches with a Check size tag. Set your size under Profile → NAICS codes, or fill it from SAM.
Open →
November 13, 2026
- Proposals
Draft without past performance
Past performance is now recommended rather than required. You can draft with fewer than three projects on file, or with none: you confirm on the draft form that your firm has no completed contracts to cite, and the proposal then says so plainly and presents your key people's experience. Three or more still scores better, and a solicitation that sets a minimum number of prior contracts may still reject a bid without them.
Open →
November 10, 2026
- Opportunities
Respond to Sources Sought notices
A new Sources Sought tab lists open federal market-research notices in your NAICS codes and states, and you can upload a notice or RFI we didn't list. Draft response writes a short answer to the notice's questions from your profile and documents, marks anything it couldn't find as a fill-in, checks the length against the notice's page limit, and exports to Word or PDF on your letterhead. You get 10 responses a month (3 on a trial) and they don't count toward your proposal drafts. If you work with teaming partners, tick the ones to include for that notice and the response names them and presents their experience as theirs.
Open → - Profile
New profile details for Sources Sought responses
Your profile can now record whether your field crews are W-2 employees or 1099 contractors, whether you usually prime or sub, your small-business size under your NAICS codes (one answer for all of them or code by code, filled in from SAM and editable), and the share of each past project your firm did itself. All are optional, and Sources Sought responses use them instead of leaving a fill-in.
Open →
October 12, 2026
- Opportunities
Local bids without an industry code now reach My Matches
Many city, county and state portals post bids with no NAICS code, which used to keep them out of your matches entirely. For Louisiana, Tennessee and California, those bids are now read against your profile and the ones that fit appear in My Matches labelled "Matched on solicitation scope" or "Possible fit"; bids we could only judge from their title are listed under "Worth a look". Six new California sources are included: LA County, the City of Los Angeles, LA Metro, Long Beach, San Bernardino County and every California agency on OpenGov.
Open →
October 6, 2026
- Proposals
Proposals follow the solicitation's own structure
When a solicitation says how the response must be organized, your draft now uses its tabs, volumes and section names, in its order, instead of a fixed set of sections. Forms, certificates and other attachments are listed as tabs to insert, each with a to-do, rather than written as narrative, and sections are sized to any stated page limits. A sealed bid or price-only quote gets a letter and a price schedule, not narrative nobody asked for. Solicitations that don't state an organization are drafted as before.
Open → - Proposals
Cost build-up is its own internal section
When you ask for a cost build-up, it now appears as a separate Cost Build-Up card on the proposal page, and the price section carries only what the buyer should see. The build-up stays out of the Word and PDF exports unless you tick Include cost build-up, so your margins and indirect rates don't go out by accident. If the price section changes afterwards, the card tells you the build-up is out of date.
Open → - Proposals
Exports use Times New Roman 12 on one-inch margins
Word and PDF exports now default to Times New Roman 12-point with one-inch margins, the format solicitations most often require. Check your solicitation for a different font, spacing or margin rule before you submit.
Open →
September 15, 2026
- Proposals
Regenerate a single proposal section
Every section of a proposal now has a Regenerate button that rewrites just that section from scratch against the current solicitation and your profile, following your instructions and the projects, people and partners you pick. When a solicitation is amended, the amendment banner links straight to the sections that need it. You get 4 regenerations per proposal and they don't count toward your monthly drafts; every change shows up under Changes to review, where you can keep it or restore the earlier version.
Open →
September 14, 2026
- Proposals
Bring a teaming partner or mentor onto a proposal
When you start a draft, tick the partners you're bidding with and say why (their past performance, a capability you lack, capacity, a mentor-protégé relationship, or a set-aside requirement), with a note for the writer. The proposal presents their experience as theirs: each partner project carries a "Performed by" line on the proposal page and in the Word and PDF exports, and the writer is told never to merge a partner's record with your own. Partners you don't tick stay out of the draft entirely.
Open → - Profile
Teaming partners, mentors and JV members on your profile
The Subcontractors tab is now Teaming partners & subcontractors. Record what each partner is to you (SBA 8(a) mentor, teaming partner, JV member or sub), the agreement you have with them, and attach their agreement, statement of capabilities and certificate of insurance. Past-performance projects can be marked as performed by a partner; they are shown as the partner's work and don't count toward your own three-project minimum. Every uploaded document now has View and Download buttons.
Open →
September 8, 2026
- Proposals
Your uploaded documents now inform your proposals
The proposal writer reads the text of the resumes, reference letters, and capability statement you upload to your profile, so key-personnel and past-performance sections draw on what those files actually say. Scanned PDFs are read overnight.
Open → - Profile
Reference letters and headshots upload again
Attaching a reference letter to a past-performance project or a photo to a key-personnel entry was failing silently. Both work now.
Open →
September 7, 2026
- Opportunities
Saved tab
Saved bids and the solicitations you uploaded yourself now live in their own tab next to My Matches and Browse Portals. Uploads still being processed show in a strip at the top so you can pick up where you left off.
Open →
September 4, 2026
- Opportunities
Upload your own solicitation
Found a bid we didn't catch? Upload the package and we pull out the agency, deadline, and scope, then score it and draft against it like any other opportunity. You confirm the details before it goes live in your feed.
Open → - Profile
Tabbed company profile with a readiness checklist
The profile is split into Basics, Company, Capabilities, Compliance, Bonding, and Documents. A checklist beside the form shows exactly what's left before proposal drafting unlocks, and it updates as you type.
Open → - Profile
Military service on key personnel, and Word documents accepted
Key personnel can record branch, rank, and MOS, rating, or AFSC, which evaluators on DoD and VA bids read as direct experience. Resumes, licenses, credentials, and bond letters now accept .docx as well as PDF, and more document types have their own upload slots.
Open →
August 31, 2026
- Proposals
Proposal drafts read like a document
Headings, bullet lists, numbered lists, quotes, and tables in a draft now render on screen the same way they export to Word and PDF.
Open →
August 30, 2026
- Plans
New plans: Starter, Professional, Growth, Enterprise
Plans now scale on three things: how many states you see opportunities in, how many proposals you can draft per month, and which research tools are unlocked. The success fee is gone for everyone.
Open →
August 28, 2026
- Proposals
Draft without a capability statement
A capability statement is now recommended rather than required. Once the essentials, bonding, past performance, and key personnel are in, you can start drafting.
Have a request? Email support@searchbidwin.com.